This is what Accomptant generates from your QuickBooks data after the first sync. Real example from an HVAC contractor in the Midwest, anonymized. Use the Print button above to save this as a PDF.

Job Profitability Report

16 SEER AC Changeout, 4-ton

Job #2026-0512-AC  ·  5/3/2026 – 5/4/2026  ·  Customer: anonymized for sharing  ·  Indianapolis, IN

Accomptant - AI Controller

accomptant.io

Synced automatically from QuickBooks · no manual entry

Revenue

$14,800

Total cost

$8,310

+$780 vs estimate

Gross profit

$6,490

Est: $7,270

Margin

43.9%

Est: 49.1%

Headline insight

3 of your last 11 AC changeouts had post-install callbacks within 7 days. That’s a 27% callback rate against an industry target of under 8%.

This job’s $210 callback is one symptom. The pattern is the leak to fix — not the materials variance.

Materials

Line itemEstimatedActualVariance

Carrier 4-ton condenser (16 SEER)

Supplier mid-month price update

$3,200$3,400+$200

Evaporator coil + line set

$820$850+$30

R-410A refrigerant (initial charge)

$160$180+$20

Misc materials (electrical, plumbing, fittings)

$200$220+$20
Materials subtotal$4,380$4,650+$270

Labor

Line itemEstimatedActualVariance

Lead tech (Jake) @ $85/hr loaded

12 hrs planned, 14 hrs actual — extra time on line-set bend

$1,020$1,190+$170

Helper (Marco) @ $55/hr loaded

10.5 hrs planned, 12 hrs actual

$580$660+$80
Labor subtotal$1,600$1,850+$250

Subcontractors

Line itemEstimatedActualVariance

Electrical sub — 240V circuit upgrade

$350$400+$50
Subcontractors subtotal$350$400+$50

Callback (5/9)

Line itemEstimatedActualVariance

Tech revisit 5/9 — low refrigerant pressure

2 hrs @ $85/hr — slow leak at coil flare

$0$170+$170

Refrigerant top-off (R-410A)

$0$40+$40
Callback (5/9) subtotal$0$210+$210

Allocated overhead

Line itemEstimatedActualVariance

Allocated overhead (8.1% of revenue, last 90d avg)

$1,200$1,200
Allocated overhead subtotal$1,200$1,200

AI summary

This job came in 5.3 percentage points under your estimated margin (43.9% actual vs 49.1% estimated). Materials ran $270 over plan (mid-month supplier price update on the Carrier condenser) and labor ran $250 over (extra time on the line-set bend).

The bigger flag is the $210 callback on 5/9 — slow refrigerant leak at the evap coil flare. Across your last 30 days, 3 AC changeout jobs had post-install callbacks within 7 days. Recommend a root-cause review with Jake and Marco on flare technique before the summer push.

Net: still a profitable job, but the callback rate is the leak to fix, not the materials variance.

Benchmark

  • Industry margin for 16-SEER residential AC changeouts: 38–45%
  • Your shop’s 90-day AC changeout average: 41.2%
  • This job: 43.9% (above your average, within industry range)
  • Callback rate on AC changeouts (last 30d): 3 of 11 jobs = 27% (industry target: under 8%)

Generated by Accomptant · accomptant.io

Page 1 of 1

Want a report like this from your actual data?

Connect QuickBooks in 10 minutes. Get your first real job-profit report the same day. 14-day free trial, no credit card.

Start Your Free Trial